Trade Estimating & Takeoff Services
Quantity takeoffs and line-item cost estimates across 13 offered trades for subcontractors, general contractors and fabricators. A trade estimate is typically $150β$1,000, depending on project size and scope, and most are delivered in 24β48 hours.
All Supported Trade Disciplines
Choose your specific trade division below to view measurement standards, material scopes, and pricing guidelines.

Concrete Estimating
Detailed takeoff and estimation for foundations, slabs, footings, rebar, formwork, and tilt-up panels.

Drywall Estimating
Comprehensive quantity counts for gypsum boards, metal studs, insulation, taping, joint compound, and finishes.

Steel Estimating
Structural steel framing, joists, metal decking, staircases, and miscellaneous metal takeoffs for fabricators and erectors.

Masonry Estimating
CMU block counts, brick veneer, mortar, grout, lintels, and flashing quantity takeoffs.

Sitework Estimating
Earthwork cut and fill volumes, grading, building pad preparation, and mass excavation takeoffs.

Civil Estimating
Heavy civil infrastructure, underground utility networks (storm/sanitary/water), roadway paving, and concrete curb & gutter.

Roofing Estimating
Commercial TPO/EPDM membranes, asphalt shingles, standing seam metal roofs, underlayment, and flashing takeoffs.

Flooring Estimating
Carpet tile, VCT, LVT, hardwood, ceramic tile, and floor prep material quantity takeoffs.

Painting Estimating
Interior and exterior surface area measurements, paint volume calculation, and wall coating line items.

Lumber & Framing Estimating
Wood framing cut lists, dimensional lumber, OSB/plywood sheathing, roof trusses, and joist takeoffs.

Electrical Estimating
Detailed quantity takeoffs for electrical switchgear, distribution panels, conduit, branch wiring, fixtures, low voltage, fire alarm, and backup generators.

Plumbing Estimating
Itemized takeoffs for sanitary waste & vent (DWV), domestic water, storm drainage, gas distribution, and plumbing fixture counts.

HVAC Estimating
Detailed takeoffs for galvanized ductwork poundage, duct fittings, hydronic piping, air distribution devices, and commercial mechanical equipment.
Coordinate an Industrial Building or Site Package
Choose the trades shown in your construction documents and identify vendor supply, owner-furnished items and installation boundaries. Our industrial construction scope guide explains package inputs, outputs and exclusions. A multi-trade request does not automatically include specialist plant systems.
Request Your Trade Estimating Quote
Send your plans to receive a flat-rate proposal after reviewing your project documents.
Need Mechanical, Electrical and Plumbing Estimating Together?
MEP estimating combines the specified HVAC, electrical and plumbing scopes. Send all three drawing sets and equipment schedules, and identify responsibility for equipment power, controls, supports, insulation and testing. Ask for separate discipline totals and a stated cross-trade scope basis in the proposal.
Review the HVAC scope, electrical scope and plumbing scope. For a broader building budget, see construction cost estimating.
Quantities follow the supplied design. Equipment sizing, load calculations and engineering coordination are outside estimating. Request a combined scope proposal.
Frequently Asked Questions
Do you estimate single trades or only full multi-trade projects?β
We estimate both. Subcontractors can submit a single trade scope, such as concrete, drywall, electrical or roofing. General contractors can submit complete drawing sets for multi-trade coverage. Most estimates typically cost $150β$1,000, depending on project size and scope, and are ready in 24β48 hours. The proposal confirms included scope, the fee and the date.
What drawings are required for a trade-specific takeoff?β
Share a plan link or email the architectural and structural PDF sheets relevant to your trade, along with specifications, addenda and the project address or zip code.
Can you provide localized supplier pricing and labor wages?β
Yes. Priced estimates are adjusted to the project location and labor basis (union, open shop or prevailing wage). Supplier quotes or crew rates you provide replace our figures.