CSI Division 31β€’Typically 24–48 hours

Sitework Estimating and Takeoff Services

Earthwork cut and fill volumes, grading, building pad preparation, and mass excavation takeoffs. For trade subcontractors and general contractors: Earthwork Cut/Fill Volume Schedule (.xlsx), with PDF markups and pricing where included in the agreed scope.

Share the current trade drawings, specifications, project location and bid deadline. Sitework estimates typically cost $150–$1,000, depending on project size and scope. Most are completed in 24–48 hours.

Request an Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

Loading the drawing uploader…

Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

Professional Sitework Estimating and material takeoffs
CSI Division 31
Sitework Estimating Scope Guide

Review the Sitework Takeoff Scope

Use the scope, units and document requirements below to define your sitework package. Choose measured quantities for your own rates, a supplier-facing material list, or a priced estimate with an agreed material, labor and equipment basis.

Agree the digital measurement workflow, workbook format and PDF markup scope in the proposal. Named software in workflow examples requires project-specific confirmation and does not establish a license or certification. For priced work, identify the material, labor and equipment inputs supplied or approved by the client.

CSI Division
CSI MasterFormat Scope
24–48 hrs
Typical turnaround
.xlsx + PDF
Editable Deliverables

Choose the Required Output

These scope guides help trade subcontractors, general contractors and owners compare the required inputs and deliverables:

  • Trade subcontractors: Use measured quantities when your team supplies its own rates. Confirm the required units, breakdown and exclusions.
  • General Contractors: Bid leveling subcontractor proposals and estimating self-performed sitework scopes.
  • Contractors and owners needing costs: Request a priced construction estimate with the document stage, pricing date and missing inputs identified.
  • Purchasing teams and suppliers: A bill of materials uses agreed stock lengths and package units for supplier review before ordering.

Building and Site Packages for Industrial Projects

For an industrial building/site package, send the survey, existing/proposed grading surfaces, geotechnical inputs and civil bid items. Separate building-pad work, paving, hauling and utility interfaces; use supplied factors and identify missing surface information.

Review industrial construction scope, inputs and exclusions.

How to Reconcile Sitework Quantities

Measurement basis

Label earthwork volumes as bank, loose or compacted CY. State survey surfaces, limits and the geotechnical conversion basis rather than combining unlike volumes.

Overlap and omission checks

Reconcile stripping, excavation, reusable fill, unsuitable disposal and import as separate movements. Do not count the same excavated material as both reusable fill and disposal.

What to Send for a Sitework Quote

Drawing and specification inputs

  • Existing survey, proposed grading, earthwork limits and civil details
  • Geotechnical report, pavement build-ups, stripping and disposal requirements
  • Contractor-confirmed haul distances, import/disposal quotes and bank-to-loose or compacted conversion basis

Scope decisions to confirm

  • Identify whether each volume is bank, loose or compacted and which geotechnical factors apply.
  • Separate excavation, reusable fill, unsuitable disposal and imported material; subsurface unknowns need stated allowances.

Include the drawing issue date, addenda, project location and bid deadline. If plans are incomplete, identify the missing information so the proposal can state any provisional scope. Request a scope review.

What Is Counted: Sitework

CSI MasterFormat Division 31 (CSI Division 31). The items below are what is counted when that scope is in the proposal. Confirm exclusions and drawing interfaces before comparing the quantities to a bid.

Earthwork Cut & Fill Modeling

Cubic Yards (CY)
  • β€’Mass excavation cut volumes and engineered fill placement requirements
  • β€’Topsoil stripping (4", 6", 8" depths) and finished topsoil respread
  • β€’Building pad over-excavation and structural select fill import
  • β€’Off-site export of unsuitable soils and on-site cut/fill balancing

Site Clearing & Demolition

Acres & SF
  • β€’Site clearing and grubbing by acre and tree count removal
  • β€’Existing asphalt and concrete pavement demolition and removal
  • β€’Existing curb, sidewalk, and structure removal square footages
  • β€’Saw-cutting perimeter lines and tree protection fencing (LF)

Erosion Control & Stormwater BMPs

LF & EA Counts
  • β€’Silt fence, super silt fence, and wire-backed sediment barriers
  • β€’Construction entrance rock pads with geotextile underlayment
  • β€’Inlet protection filters, check dams, and sediment basin excavation
  • β€’Temporary hydroseeding, slope stabilization mats, and straw wattles

Subgrade Preparation & Aggregates

Square Yards (SY) & Tons
  • β€’Subgrade proof-rolling, lime/cement stabilization, and soil conditioning
  • β€’Aggregate base course (ABC, crushed stone) by compacted thickness
  • β€’Geotextile stabilization fabrics and geogrid reinforcement layers
  • β€’Fine grading under building slabs, parking areas, and sidewalks

How to Read a Sitework Takeoff

Confirm these outputs in the proposal. Keep drawing references, measured quantities, purchase allowances and pricing inputs separately reviewable.

Units and schedule attributes: Cubic Yards (CY) Β· Square Yards (SY) Β· Tons Β· Linear Feet (LF) & Acres. Equipment ratings and capacity labels identify scheduled items; they are not design calculations.

Earthwork Cut/Fill Volume Schedule (.xlsx) (Excel Workbook)

Itemized summary of raw cut, engineered fill, topsoil strip, select fill import, and net dirt balance.

3D Grading Heatmap PDF (Layered PDF)

Visual elevation color map illustrating deep cut zones (red) versus heavy fill zones (blue).

Erosion Control & Demolition BOM (BOM Schedule)

Linear feet of silt fencing, demolition square footages, and aggregate base course tonnages.

Sitework Scope Boundaries

Measured when included in the proposal

  • 3D earthwork cut and fill net volume calculations (CY)
  • Topsoil strip and respread quantities based on civil grading plans
  • Site clearing, grubbing, and asphalt/concrete demolition areas
  • Erosion control SWPPP items (silt fence, rock pads, inlet protection)
  • Subgrade aggregate base tonnage (ABC) by paving section
  • Color-coded PDF cut/fill surface heatmaps and Excel (.xlsx) reports

Requires supporting project documents

  • Contractor-specific compaction, shrink, and swell percentage assumptions
  • Geotechnical soils investigation reports and subsurface boring data
  • Local quarry aggregate delivery rates and dump site tipping fees
  • Excavator and scraper crew hourly mobilization and operator rates

Not assumed in the trade scope

  • Unforeseen underground rock excavation beyond documented soil borings
  • Environmental remediation or hazardous contaminated soil disposal
  • Off-site municipal road widening unless civil plans detail exact scope

Assign each interface to one contractor before comparing bids. Unresolved drawing conflicts belong in the clarification log; the takeoff does not supply engineering, code interpretation or permit approval.

Sitework Drawing Review Workflow

Review this sequence against the current drawing issue and agreed scope. Identify any missing data before measurement or pricing starts.

  1. 1

    Import existing and proposed civil topographic contours into digital grading software

  2. 2

    Model 3D surface mesh to calculate net cut/fill volumes across subgrade zones

  3. 3

    Measure site clearing acres, demolition square footage, and tree removals

  4. 4

    Quantify erosion control BMPs, aggregate subbase tons, and pad prep materials

  5. 5

    Deliver cut/fill volume summary Excel sheet with 3D color elevation heatmaps

Tools & Industry Standards

Tool / StandardPurpose & Application
CSI Division 31Counted scope is organized under Division 31. Reconcile those headings with the project specification sections and the bid format.
Estimate classification referenceClassification depends on document maturity and project type; use the applicable framework when expressly included in the scope. This is not a certification or a guaranteed accuracy range.

Software commonly used in the industry

Estimators commonly use the tools below for sitework takeoff. This list describes industry practice. It does not state which licenses this desk holds. The proposal confirms the measurement workflow and the Excel workbook and PDF markup you receive.

  • PlanSwift. Commonly used in the industry for assembly-based quantity takeoff.
  • Bluebeam Revu. Commonly used in the industry for calibrated PDF measurement and color markups.
  • On-Screen Takeoff. Commonly used in the industry for digital quantity measurement on plan sets.
  • Microsoft Excel. Commonly used in the industry to organize counted quantities and priced line items.

Pricing & Turnaround Tiers

Earthwork and grading packages stay in that typical span. Most sitework estimates cost $150–$1,000 and are turned around in 24–48 hours. See the pricing and fees guide.

Project ScopePrice RangeTurnaroundRush Available
Most Sitework estimatesTypically $150–$1,000Typically 24–48 hoursConfirmed in the proposal
Larger or phased Sitework scopeTypically $150–$1,000Typically 24–48 hoursConfirmed in the proposal

Check the Volume State Before Pricing Earthwork

Bank, loose and compacted volumes are different bases. A net cut/fill balance cannot be treated as a truckload or imported-fill order without stated conversions.

  • Identify the existing survey, proposed surface, limits and document issue used for cut/fill measurement.
  • Separate topsoil, suitable reuse, unsuitable disposal and imported fill; use the supplied geotechnical and contractor conversion basis.
  • Keep haul distance, payload, tipping fees and aggregate delivery inputs identifiable when pricing is included.

Subsurface unknowns require stated allowances. Grading design, environmental remediation and changes to approved levels remain outside a drawing-based takeoff.

Civil utilities and restoration β€” Assign trenching and surface reinstatement without duplicating earthwork.

Earthwork quantities without prices β€” Apply your own crew, hauling and disposal rates to the stated volume basis.

Frequently Asked Questions

How do you calculate 3D earthwork cut and fill volumes from civil drawings?↓

We digitize existing topographic contours and proposed grading contours using 3D civil modeling software, generating a triangulated surface grid that calculates precise cut and fill cubic yardage.

Do you separate topsoil stripping and building pad select fill from general grading?↓

Separate stripping, building-pad over-excavation, select fill and parking subgrade using the depths, limits and material basis in the issued plans and geotechnical information. Missing depths need clarification or an explicitly agreed allowance; no standard stripping depth is assumed.

Can your sitework takeoff help balance dirt on-site to reduce hauling costs?↓

Yes. Our takeoff identifies net dirt surplus or deficit, allowing earthmoving contractors to evaluate grading adjustments and minimize off-site truck hauling fees.

πŸ›‘οΈ

Prepared by: the estimating desk at Construction Estimating Services (F&K Estimations LLC). Questions about this page can be sent to info@constructionestimatingservices.org.

Last Updated: October 5, 2026

Ready to Win Your Next Sitework Bid?

Send the civil surfaces you have. Most sitework estimates typically cost $150–$1,000 and are ready in 24–48 hours.

Scope, Fees and Delivery

Send the current PDF drawing set, specifications, addenda, project location, trade scope and bid deadline. The proposal identifies the quantities or priced items included, Excel and PDF deliverables, pricing basis, assumptions and exclusions.

Most estimates typically cost $150–$1,000, depending on project size and scope. The proposal states the fee after the drawings, trade scope and deliverables are reviewed. For ongoing estimating needs, request a scope proposal; availability and any recurring terms must be confirmed in writing.

Quote response timing is confirmed after reviewing the request and drawing completeness. Most estimates are typically delivered in 24–48 hours. Timing still depends on project size, drawing quality, trade count and deadline, and the proposal states the delivery date.

Identify the drawing revision and include all addenda. Changes to the agreed document set or scope require review of the fee and delivery schedule.

Estimates quantify the supplied drawings and specifications with stated assumptions and exclusions. Engineering, architectural design, permitting, inspection, code certification and professional stamping are excluded.

Review fee examples or request a project proposal.