Construction Estimating Services: Quantity Takeoffs in 24β48 Hours
Measured quantities from your drawings β linear feet, square feet, cubic yards and counts β with a marked-up PDF showing what was counted.
For contractors, builders and developers. Agreed deliverables: Quantity workbook (.xlsx); Color-coded PDF markups. A typical quantity takeoff is $150β$1,000. Project size and scope set the fee, and most are finished in 24β48 hours.
What is a quantity takeoff in construction?
A quantity takeoff (QTO) records measured lengths, areas, volumes and counts from the supplied drawings for the agreed trades. The quantity workbook identifies units and drawing references without adding prices.
What Quantity Takeoff Services Covers
A quantity takeoff is the measurement step of estimating: counting and measuring every item on the drawings that has to be bought and installed. It produces quantities, not prices. You apply your own unit costs, or send the quantities to suppliers for pricing.
Contractors outsource takeoffs when they already know their costs but do not have the hours to measure a large drawing set before the bid deadline. The quantities are only useful if you can check them, so every item is color-coded on the PDF sheet it was measured from.
Who This Is For
- Trade subcontractors: Quantities for their own scope, such as concrete, drywall, roofing or electrical, to price with their own labor and material rates.
- General contractors: Independent quantities to check subcontractor bids, or to carry a trade without sub coverage.
- Estimators with their own software: Measured quantities in a format they can import or re-key into their estimating system.
Not quite what you need?
Need a supplier-ready bill of materials in purchase units? See material takeoff services.
Need quantities priced into a dollar estimate? See construction cost estimating.
Building and Site Packages for Industrial Projects
Need quantities for an industrial building/site bid package? Use this service when your team supplies its own rates. Confirm trades and drawing issues, and identify owner-furnished items and vendor installation boundaries; use the industrial scope guide to review the overall construction package.
Review industrial construction scope, inputs and exclusions.
What You Receive
Quantity workbook (.xlsx)
Each line has item description, drawing sheet reference, unit (LF, SF, CY, EA), net quantity, waste factor and gross quantity. Grouping by trade, CSI division, floor or building area is agreed before we start.
Color-coded PDF markups
Every measured area, run and count highlighted on the drawings, with a legend matching the workbook lines. Your team can verify any number by finding its color on the sheet.
Takeoff notes
Drawing revision used, scale checks, conflicts found between sheets, and items that were not measurable from the drawings provided.
Review actual takeoff workbook excerpts with quantities, units and drawing references. The published excerpts show measured scope; confirm priced-estimate and PDF markup outputs in your proposal.
Those measured files are what most takeoffs include. The fee is typically $150β$1,000, depending on project size and scope, and most are ready in 24β48 hours.
Check a Quantity Before Applying Your Rates
Choose the breakdown your estimator will price: by trade, floor, area or phase. An overall project quantity may hide the different assemblies behind it.
- Follow a workbook line back to the sheet and revision; confirm scale, measurement unit and the stated opening deductions.
- Keep net measured quantity separate from an agreed waste or purchase allowance. A supplier order and an installed quantity serve different purposes.
- Where a plan, schedule and section disagree, retain the discrepancy and the stated measurement basis for project-team resolution.
Quantities-only work does not include unit prices, labor productivity or design decisions. Agree specification-only items and any additional breakdown before measurement.
Convert quantities to a material list β Confirm stock lengths and package coverage for purchasing.
Price the measured scope β Add an agreed material, labor and equipment basis when you need a dollar estimate.
How It Is Produced
Define the scope and breakdown
We confirm which trades or divisions to measure, and how you want quantities split (by floor, phase, building or system).
Verify scale and sheet set
Scales are checked against dimensioned elements on each sheet before measuring, and sheets are checked against the drawing index for anything missing.
Measure
Linear, area, volume and count measurements using the agreed digital workflow, with drawing references and PDF markup scope confirmed in the proposal.
Cross-check
Plan quantities are checked against schedules, sections and details. For example, door counts against the door schedule, and footing lengths against the foundation plan.
Deliver
Workbook, marked-up PDFs and notes, with conflicts listed for your RFIs.
Methodology, Standards & Software
PlanSwift, Bluebeam Revu, and Excel are tools commonly used in the industry for takeoff and pricing. Naming them describes that practice. It does not state which licenses this desk holds. Confirm the software, exports, pricing references and methodology in the proposal. Standards references do not certify compliance.
Estimating Standards
Workflow options to confirm
Confirm the measured-sheet coverage and drawing references in the proposal so your team can review the workbook alongside its PDF markups.
What to Send Us
- Drawing set as vector PDF (preferred), CAD, or a clear scanned PDF
- Schedules and details for the trades being measured
- Addenda issued to date
- Your preferred breakdown (by floor, area, phase, or CSI division)
Scope Exclusions
- Pricing: quantities only. See construction cost estimating if you need dollars
- Items not shown on the drawings provided, such as specification-only items, unless you ask us to list them
- Shop-drawing level detail (for example, rebar bending schedules), unless agreed in advance
Primary Cost Drivers & Estimating Factors
Use these project variables to define the requested measurement and pricing basis:
Takeoff vs. Cost Estimating vs. Material Lists
| Service Type | Primary Deliverable | Unit Pricing Included? | Ideal User Profile |
|---|---|---|---|
| Quantity Takeoff (QTO) | Net & gross quantities (LF, SF, CY, EA) | No (Quantities only) | Trade subcontractors & GCs with established unit costs |
| Cost Estimating | Quantities + labor, material, equipment & GC costs | Yes (Full dollar estimate) | General contractors, developers, lenders & public bidders |
| Material Takeoff (BOM) | Commercial stock lengths, sheets, bundles & bags | No (Purchase units only) | Lumberyards, material suppliers & purchasing managers |
Pricing & Turnaround
Most quantity takeoffs fall between $150 and $1,000 per estimate. Sheet count and measured scope decide the fee, and most takeoffs are ready within 24β48 hours.
The written proposal confirms that fee and the delivery date for the drawings you send. The same typical range is explained on the pricing page.
Trades Commonly Included
Related Technical Guides & Regional Hubs
Estimator Guides & References
- Digital Takeoff Workflows: Bluebeam Revu vs. PlanSwift β
How digital takeoff layers, scales, and assemblies prevent measurement omissions.
- Concrete Rebar Tonnage & Lap Splice Quantification β
Mathematical formulas for calculating structural steel tonnage from engineering schedules.
State Project Guides
- Indiana Takeoff Services β
Digital quantity takeoffs for commercial and residential builders in Indiana.
- Texas Takeoff Services Hub β
Rapid quantity takeoffs for high-volume commercial and civil contractors in Texas.
- California Takeoff Services Hub β
Quantities measured from the California project structural drawings and specifications.
Questions About Quantity Takeoff Services
What units do you measure in?
In the unit each trade buys and installs in. For example, CY for concrete, SF of wall or board for drywall, squares for roofing, LF for pipe and conduit, and EA for fixtures and devices. Tell us if you need a different unit.
Are waste factors included?
Net quantities and waste factors are shown in separate columns, so you can use your own waste percentage instead of ours.
Can I get quantities broken down by floor or phase?
Yes. Tell us the breakdown before we start; changing it after the takeoff is finished means re-measuring.
What if the drawings conflict?
We measure what is drawn, list the conflict in the takeoff notes (for example, a plan dimension that disagrees with the section), and state which one we used.
How do I verify the quantities once I receive the files?
Every measured line item corresponds to a specific color-coded markup layer on the returned PDF drawings, allowing you to click or visually inspect the exact surface or run quantified.
Can you export takeoff data into our in-house estimating spreadsheet?
Yes. Our standard deliverable is an unlocked Microsoft Excel file formatted so rows and columns can be copied directly into your master estimating system.
Published by Construction Estimating Services. See our company and estimating scope. Questions about these deliverables? Email the estimating desk.
Scope, Fees and Delivery
Send the current PDF drawing set, specifications, addenda, project location, trade scope and bid deadline. The proposal identifies the quantities or priced items included, Excel and PDF deliverables, pricing basis, assumptions and exclusions.
Most estimates typically cost $150β$1,000, depending on project size and scope. The proposal states the fee after the drawings, trade scope and deliverables are reviewed. For ongoing estimating needs, request a scope proposal; availability and any recurring terms must be confirmed in writing.
Quote response timing is confirmed after reviewing the request and drawing completeness. Most estimates are typically delivered in 24β48 hours. Timing still depends on project size, drawing quality, trade count and deadline, and the proposal states the delivery date.
Identify the drawing revision and include all addenda. Changes to the agreed document set or scope require review of the fee and delivery schedule.
Estimates quantify the supplied drawings and specifications with stated assumptions and exclusions. Engineering, architectural design, permitting, inspection, code certification and professional stamping are excluded.