CONSTRUCTION
ESTIMATING SERVICES

Construction Estimating Services: Quantity Takeoffs in 24–48 Hours

Measured quantities from your drawings β€” linear feet, square feet, cubic yards and counts β€” with a marked-up PDF showing what was counted.

For contractors, builders and developers. Agreed deliverables: Quantity workbook (.xlsx); Color-coded PDF markups. A typical quantity takeoff is $150–$1,000. Project size and scope set the fee, and most are finished in 24–48 hours.

Request an Estimate

Share your project details. Fields marked * are required.

Contact and project details
Include + and your international calling code.

Project Drawings (optional)

PDF, CAD/BIM, Office, ZIP or image documents. Up to 5 files, 25 MB each; account limits also apply.

Loading the drawing uploader…

Upload only documents you are authorized to share. Privacy policy. This request does not opt you into marketing messages.

Service Overview

What is a quantity takeoff in construction?

A quantity takeoff (QTO) records measured lengths, areas, volumes and counts from the supplied drawings for the agreed trades. The quantity workbook identifies units and drawing references without adding prices.

Key Takeaway:Quantity takeoffs provide net measured quantities alongside explicit waste percentages, giving contractors documented quantity baselines to apply their own labor productivity and supplier quotes.

What Quantity Takeoff Services Covers

A quantity takeoff is the measurement step of estimating: counting and measuring every item on the drawings that has to be bought and installed. It produces quantities, not prices. You apply your own unit costs, or send the quantities to suppliers for pricing.

Contractors outsource takeoffs when they already know their costs but do not have the hours to measure a large drawing set before the bid deadline. The quantities are only useful if you can check them, so every item is color-coded on the PDF sheet it was measured from.

Who This Is For

  • Trade subcontractors: Quantities for their own scope, such as concrete, drywall, roofing or electrical, to price with their own labor and material rates.
  • General contractors: Independent quantities to check subcontractor bids, or to carry a trade without sub coverage.
  • Estimators with their own software: Measured quantities in a format they can import or re-key into their estimating system.

Not quite what you need?

Need a supplier-ready bill of materials in purchase units? See material takeoff services.

Need quantities priced into a dollar estimate? See construction cost estimating.

Building and Site Packages for Industrial Projects

Need quantities for an industrial building/site bid package? Use this service when your team supplies its own rates. Confirm trades and drawing issues, and identify owner-furnished items and vendor installation boundaries; use the industrial scope guide to review the overall construction package.

Review industrial construction scope, inputs and exclusions.

What You Receive

Quantity workbook (.xlsx)

Each line has item description, drawing sheet reference, unit (LF, SF, CY, EA), net quantity, waste factor and gross quantity. Grouping by trade, CSI division, floor or building area is agreed before we start.

Color-coded PDF markups

Every measured area, run and count highlighted on the drawings, with a legend matching the workbook lines. Your team can verify any number by finding its color on the sheet.

Takeoff notes

Drawing revision used, scale checks, conflicts found between sheets, and items that were not measurable from the drawings provided.

Review actual takeoff workbook excerpts with quantities, units and drawing references. The published excerpts show measured scope; confirm priced-estimate and PDF markup outputs in your proposal.

Those measured files are what most takeoffs include. The fee is typically $150–$1,000, depending on project size and scope, and most are ready in 24–48 hours.

Check a Quantity Before Applying Your Rates

Choose the breakdown your estimator will price: by trade, floor, area or phase. An overall project quantity may hide the different assemblies behind it.

  • Follow a workbook line back to the sheet and revision; confirm scale, measurement unit and the stated opening deductions.
  • Keep net measured quantity separate from an agreed waste or purchase allowance. A supplier order and an installed quantity serve different purposes.
  • Where a plan, schedule and section disagree, retain the discrepancy and the stated measurement basis for project-team resolution.

Quantities-only work does not include unit prices, labor productivity or design decisions. Agree specification-only items and any additional breakdown before measurement.

Convert quantities to a material list β€” Confirm stock lengths and package coverage for purchasing.

Price the measured scope β€” Add an agreed material, labor and equipment basis when you need a dollar estimate.

How It Is Produced

  1. Define the scope and breakdown

    We confirm which trades or divisions to measure, and how you want quantities split (by floor, phase, building or system).

  2. Verify scale and sheet set

    Scales are checked against dimensioned elements on each sheet before measuring, and sheets are checked against the drawing index for anything missing.

  3. Measure

    Linear, area, volume and count measurements using the agreed digital workflow, with drawing references and PDF markup scope confirmed in the proposal.

  4. Cross-check

    Plan quantities are checked against schedules, sections and details. For example, door counts against the door schedule, and footing lengths against the foundation plan.

  5. Deliver

    Workbook, marked-up PDFs and notes, with conflicts listed for your RFIs.

Methodology, Standards & Software

PlanSwift, Bluebeam Revu, and Excel are tools commonly used in the industry for takeoff and pricing. Naming them describes that practice. It does not state which licenses this desk holds. Confirm the software, exports, pricing references and methodology in the proposal. Standards references do not certify compliance.

Estimating Standards

CSI MasterFormat 2020
Division 02 through Division 33 measurement breakdown.
ASTM E1557 UNIFORMAT II
Elemental building assembly classification for schematic takeoffs.
Documented measurement basis
Confirm drawing scale, revision, units, included scope and allowances before using the quantity workbook.

Workflow options to confirm

Bluebeam Revu eXtremePlanSwift ProfessionalMicrosoft Excel (Unlocked)

Confirm the measured-sheet coverage and drawing references in the proposal so your team can review the workbook alongside its PDF markups.

What to Send Us

  • Drawing set as vector PDF (preferred), CAD, or a clear scanned PDF
  • Schedules and details for the trades being measured
  • Addenda issued to date
  • Your preferred breakdown (by floor, area, phase, or CSI division)

Scope Exclusions

  • Pricing: quantities only. See construction cost estimating if you need dollars
  • Items not shown on the drawings provided, such as specification-only items, unless you ask us to list them
  • Shop-drawing level detail (for example, rebar bending schedules), unless agreed in advance

Primary Cost Drivers & Estimating Factors

Use these project variables to define the requested measurement and pricing basis:

Drawing Completeness & Scale Quality
Vector PDFs with clear dimensional strings allow rapid digitizing; scanned or low-resolution sheets require manual scale calibration.
Discipline Coordination Discrepancies
Conflicts between architectural floor plans, finish schedules, and structural sections require estimator RFI documentation.
Architectural Geometric Complexity
Curved walls, non-standard slab depressions, vaulted ceilings, and complex roof valleys require higher takeoff hours.
Breakdown Granularity Required
Splitting takeoffs by building, floor, sequence, or phase requires dedicated measurement layers in the takeoff software.

Takeoff vs. Cost Estimating vs. Material Lists

Service TypePrimary DeliverableUnit Pricing Included?Ideal User Profile
Quantity Takeoff (QTO)Net & gross quantities (LF, SF, CY, EA)No (Quantities only)Trade subcontractors & GCs with established unit costs
Cost EstimatingQuantities + labor, material, equipment & GC costsYes (Full dollar estimate)General contractors, developers, lenders & public bidders
Material Takeoff (BOM)Commercial stock lengths, sheets, bundles & bagsNo (Purchase units only)Lumberyards, material suppliers & purchasing managers

Pricing & Turnaround

Most quantity takeoffs fall between $150 and $1,000 per estimate. Sheet count and measured scope decide the fee, and most takeoffs are ready within 24–48 hours.

The written proposal confirms that fee and the delivery date for the drawings you send. The same typical range is explained on the pricing page.

Related Technical Guides & Regional Hubs

Estimator Guides & References

State Project Guides

Questions About Quantity Takeoff Services

What units do you measure in?

In the unit each trade buys and installs in. For example, CY for concrete, SF of wall or board for drywall, squares for roofing, LF for pipe and conduit, and EA for fixtures and devices. Tell us if you need a different unit.

Are waste factors included?

Net quantities and waste factors are shown in separate columns, so you can use your own waste percentage instead of ours.

Can I get quantities broken down by floor or phase?

Yes. Tell us the breakdown before we start; changing it after the takeoff is finished means re-measuring.

What if the drawings conflict?

We measure what is drawn, list the conflict in the takeoff notes (for example, a plan dimension that disagrees with the section), and state which one we used.

How do I verify the quantities once I receive the files?

Every measured line item corresponds to a specific color-coded markup layer on the returned PDF drawings, allowing you to click or visually inspect the exact surface or run quantified.

Can you export takeoff data into our in-house estimating spreadsheet?

Yes. Our standard deliverable is an unlocked Microsoft Excel file formatted so rows and columns can be copied directly into your master estimating system.

Published by Construction Estimating Services. See our company and estimating scope. Questions about these deliverables? Email the estimating desk.

Scope, Fees and Delivery

Send the current PDF drawing set, specifications, addenda, project location, trade scope and bid deadline. The proposal identifies the quantities or priced items included, Excel and PDF deliverables, pricing basis, assumptions and exclusions.

Most estimates typically cost $150–$1,000, depending on project size and scope. The proposal states the fee after the drawings, trade scope and deliverables are reviewed. For ongoing estimating needs, request a scope proposal; availability and any recurring terms must be confirmed in writing.

Quote response timing is confirmed after reviewing the request and drawing completeness. Most estimates are typically delivered in 24–48 hours. Timing still depends on project size, drawing quality, trade count and deadline, and the proposal states the delivery date.

Identify the drawing revision and include all addenda. Changes to the agreed document set or scope require review of the fee and delivery schedule.

Estimates quantify the supplied drawings and specifications with stated assumptions and exclusions. Engineering, architectural design, permitting, inspection, code certification and professional stamping are excluded.

Review fee examples or request a project proposal.